Outside tap installation provides an external water supply for garden use, washing tasks, and hose connection. The work focuses on a secure, weather-resistant fitting with checked pipework and clear handover on operation and limitations.
The existing water supply route and external wall area are inspected for safe access, visible damage, and suitable fixing points. Nearby services, obstructions, and signs of damp are noted before work begins.
The internal and external pipework route is assessed to confirm the best connection point and to identify the condition of the existing plumbing. The inspection checks for corrosion, previous repairs, inadequate insulation, or other issues that may affect the installation.
The tap position is marked and the pipework is prepared for the new connection. Where required, drilling, pipe extension, isolation, and fitting of the external tap assembly are carried out, with attention to weatherproofing and secure mounting. Any minor remedial work needed to complete the installation is addressed within the agreed scope.
The supply is turned on and the installation is checked for leaks, correct operation, and steady water flow. Joints, valves, and the external tap body are tested to confirm that the connection is sound and functioning as intended.
The finished installation is left in working order and the area is tidied where practical. Any limitations are explained, including pre-existing pipework defects, hidden defects within walls or floors, or issues that require additional plumbing work beyond the tap installation itself.
¶ Outside Tap Installation
Outside tap installation completed and the new external water point left tested and operational.